Fix GOSEC #5062
Triggered via pull request
February 17, 2026 10:54
naveenku-jfrog
labeled
#3357
Status
Cancelled
Total duration
3m 46s
Artifacts
–
transferTests.yml
on: pull_request_target
artifactory-6
3m 9s
Matrix: Transfer-Artifactory-7-Tests
Annotations
5 errors and 1 warning
|
Transfer tests (ubuntu)
Canceling since a higher priority waiting request for Transfer Tests-3357-refs/heads/master exists
|
|
Transfer tests (ubuntu)
The operation was canceled.
|
|
Transfer tests (windows)
Canceling since a higher priority waiting request for Transfer Tests-3357-refs/heads/master exists
|
|
Transfer Tests
Canceling since a higher priority waiting request for Transfer Tests-3357-refs/heads/master exists
|
|
Transfer tests (windows)
The operation was canceled.
|
|
Transfer tests (macos)
JGC-413 - Skip until artifactory bootstrap in osx is fixed
|