copy edit min net electricity generation explanation - 500 MW is the announced capacity, not PPA
1 parent 9b8fcc3 commit 494b766

File tree

1 file changed

+1
-1
lines changed

1 file changed

+1
-1
lines changed

docs/Fervo_Project_Cape-4.md

Lines changed: 1 addition & 1 deletion
Original file line numberDiff line numberDiff line change
@@ -94,7 +94,7 @@ in source code for the complete results.
9494

9595
| Metric | Result Value | Reference Value(s) | Reference Source |
9696
|-------------------------------------------------|--------------------------------------|----------------------------------------------------|-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------|
97-
| Minimum Net Electricity Generation | 501 MW | 500 MW | The 500 MW PPA (Fervo Energy, 2025) is interpreted to mean that Cape Station's net electricity generation must never fall below 500 MWe. |
97+
| Minimum Net Electricity Generation | 501 MW | 500 MW | The announced upsizing to 500 MWe (Fervo Energy, 2025) is interpreted to mean that Cape Station's net electricity generation does not fall below 500 MWe. |
9898
| Maximum Net Electricity Generation | 535 MW | | |
9999
| Maximum Total Electricity Generation | 587 MW | | Actual maximum total generation may be bounded or constrained by modular power plant design not modeled in this case study. For example, a modular design with 50MW units may constrain maximum total generation to 600 MW. |
100100
| Number of times redrilling | 2 | 2–5 | Redrilling expected to be required within 5–10 years of project start |