I want to de-trend a historical simulation with the simultaneous patch of the piControl simulation. The detrending part is fine - I'll do that in the diagnostic - but is there a way to automate extracting the relevant years from a piControl run?
I want to de-trend a historical simulation with the simultaneous patch of the piControl simulation.
The detrending part is fine - I'll do that in the diagnostic - but is there a way to automate extracting the relevant years from a piControl run?