Skip to content

[feat] Backport graceful shutdown rollout#502

Open
Al-assad wants to merge 1 commit into
apache:masterfrom
Al-assad:backport-graceful-shutdown
Open

[feat] Backport graceful shutdown rollout#502
Al-assad wants to merge 1 commit into
apache:masterfrom
Al-assad:backport-graceful-shutdown

Conversation

@Al-assad

Copy link
Copy Markdown
Member

Summary

  • Backport graceful shutdown rollout from branch-25.8.0 into master.
  • Add sentinel compatibility gate: only images whose BE entrypoint supports the terminating sentinel contract use graceful rollout; unsupported images fall back to the existing StatefulSet flow.
  • Keep master-side behavior for internal/external services, storage template immutability, readiness probe policy, TLS/mTLS readiness, and podinfo volume mount drift fixes.

Validation

  • go test ./pkg/common/utils/resource ./pkg/controller/sub_controller/disaggregated_cluster/computegroups ./pkg/controller/sub_controller/disaggregated_cluster/disaggregated_fe ./pkg/controller/sub_controller/disaggregated_cluster/metaservice
  • make manifests
  • git diff --cached --check

@Al-assad Al-assad changed the title Backport graceful shutdown rollout [feat] Backport graceful shutdown rollout Jun 26, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant