Workflow Health — 2026-08-10
Executive read: 66 total outcomes tracked across 11 workflows. PR Sous Chef dominates the volume with 49 items (19 pending), indicating the workflow is high-volume but needs tracking. Acceptance rate is 62.5%, but zero-touch rate is 0.0%, suggesting all accepted items require human review. Overall lifecycle: most workflows in flight, PR Sous Chef aging with pending backlog.
Legend:
- Status: 🟩 accepted · 🟥 rejected · 🟨 pending · ⬜ unknown/ignored
- Lifecycle health: 🟢 resolving · 🟡 in flight · 🟠 aging · 🔴 stuck · ⚪ underdefined
- References: one linked item per status emoji, in the same order as the Status column
🔴 Action Items
-
PR Sous Chef workflow — Accounts for 49 of 66 outcomes (74%). Contains 19 pending items. This workflow is high-volume and needs systematic management. Review acceptance criteria and consider implementing outcome timeouts.
-
Zero-touch acceptance rate — All 15 accepted items required human review (0.0% zero-touch rate). This indicates agent output quality needs improvement or acceptance model needs refinement. Dedicated signal types (merged PRs, completed issues, approvals) are being applied, but coverage is low.
-
Pending backlog — 22 items remain pending across workflows. PR Sous Chef alone has 19 pending items. No items are aged >48 hours yet, but without resolution, some will reach aging status in the next cycle.
-
Data quality — 0 items evaluated with fallback existence check (actual: 0 of 66 = 0.0%). Evidence strength is skewed toward medium (engagement/retention) with minimal strong evidence (merged/completed).
Detailed metrics, evidence quality, workflow counts, and trends
Outcome Scorecard — 2026-08-10
| Metric |
Value |
Status |
| Acceptance rate |
62.5% |
🟡 60-80% |
| Zero-touch rate |
0.0% |
🔴 <25% |
| Waste rate |
13.6% |
🟡 10-25% |
| Median time to resolution |
— |
— |
| Accepted |
15 / 66 |
— |
| — strong evidence |
2 |
merged, completed, approved |
| — medium evidence |
13 |
engaged, retained |
| — weak evidence |
0 |
existence only |
| Rejected |
9 |
— |
| Ignored |
7 |
no observable follow-up |
| Zero-touch |
0 / 15 |
— |
| Pending |
22 |
— |
| Runs checked |
23 |
— |
Per-Workflow Breakdown
| Workflow |
Accepted |
Rejected |
Ignored |
Pending |
Acceptance |
Zero-touch |
| PR Sous Chef |
9 |
9 |
0 |
19 |
50% |
0% |
| Contribution Check |
1 |
0 |
0 |
2 |
100% |
0% |
| Daily Model Inventory Checker |
0 |
0 |
0 |
1 |
0% |
0% |
| Daily Sentrux Report |
0 |
0 |
1 |
0 |
0% |
0% |
| Daily Observability Report for AWF Firewall and MCP Gateway |
0 |
0 |
1 |
0 |
0% |
0% |
| Detection Analysis Report |
0 |
0 |
1 |
0 |
0% |
0% |
| Duplicate Code Detector |
3 |
0 |
0 |
0 |
100% |
0% |
| Daily Regulatory Report Generator |
1 |
0 |
1 |
0 |
100% |
0% |
| Agentic Workflow Audit Agent |
0 |
0 |
1 |
0 |
0% |
0% |
| Daily Project Performance Summary Generator (Using MCP Scripts) |
1 |
0 |
1 |
0 |
100% |
0% |
| Copilot PR Prompt Pattern Analysis |
0 |
0 |
1 |
0 |
0% |
0% |
Evidence Quality
All 15 accepted items were evaluated with dedicated signal types (merged PRs, engagement/retention). No fallback-only evaluations.
📊 Measured by Outcome Collector · haiku45 · 15.1 AIC · ⌖ 2.56 AIC · ⊞ 7.4K
Workflow Health — 2026-08-10
Executive read: 66 total outcomes tracked across 11 workflows. PR Sous Chef dominates the volume with 49 items (19 pending), indicating the workflow is high-volume but needs tracking. Acceptance rate is 62.5%, but zero-touch rate is 0.0%, suggesting all accepted items require human review. Overall lifecycle: most workflows in flight, PR Sous Chef aging with pending backlog.
Legend:
🔴 Action Items
PR Sous Chef workflow — Accounts for 49 of 66 outcomes (74%). Contains 19 pending items. This workflow is high-volume and needs systematic management. Review acceptance criteria and consider implementing outcome timeouts.
Zero-touch acceptance rate — All 15 accepted items required human review (0.0% zero-touch rate). This indicates agent output quality needs improvement or acceptance model needs refinement. Dedicated signal types (merged PRs, completed issues, approvals) are being applied, but coverage is low.
Pending backlog — 22 items remain pending across workflows. PR Sous Chef alone has 19 pending items. No items are aged >48 hours yet, but without resolution, some will reach aging status in the next cycle.
Data quality — 0 items evaluated with fallback existence check (actual: 0 of 66 = 0.0%). Evidence strength is skewed toward medium (engagement/retention) with minimal strong evidence (merged/completed).
Detailed metrics, evidence quality, workflow counts, and trends
Outcome Scorecard — 2026-08-10
Per-Workflow Breakdown
Evidence Quality
All 15 accepted items were evaluated with dedicated signal types (merged PRs, engagement/retention). No fallback-only evaluations.