Skip to content

doc: fix changelog#19515

Closed
MylesBorins wants to merge 1 commit intonodejs:masterfrom
MylesBorins:fix-changelog
Closed

doc: fix changelog#19515
MylesBorins wants to merge 1 commit intonodejs:masterfrom
MylesBorins:fix-changelog

Conversation

@MylesBorins
Copy link
Contributor

s/9.7.1/9.8.0

s/9\.7\.1/9\.8\.0
@nodejs-github-bot nodejs-github-bot added the meta Issues and PRs related to the general management of the project. label Mar 21, 2018
MylesBorins referenced this pull request Mar 21, 2018
Notable changes:

* assert:
  - From now on all error messages produced by `assert` in strict mode
    will produce a error diff. (Ruben Bridgewater)
    #17615
  - From now on it is possible to use a validation object in throws
    instead of the other possibilities. (Ruben Bridgewater)
    #17584
* crypto:
  - allow passing null as IV unless required (Tobias Nießen)
    #18644
* fs:
  - support as and as+ flags in stringToFlags() (Sarat Addepalli)
    #18801
* tls:
  - expose Finished messages in TLSSocket (Anton Salikhmetov)
    #19102
* tty:
  - Add getColorDepth function to determine if terminal supports colors
    (Ruben Bridgewater) #17615
* util:
  - add util.inspect compact option (Ruben Bridgewater)
    #17576
* **Added new collaborators**
  - [watson](https://github.com/watson) Thomas Watson

PR-URL: #19428
@BridgeAR BridgeAR added the fast-track PRs that do not need to wait for 72 hours to land. label Mar 21, 2018
@MylesBorins
Copy link
Contributor Author

landed in 0ac4ef9

MylesBorins added a commit that referenced this pull request Mar 21, 2018
s/9\.7\.1/9\.8\.0

PR-URL: #19515
Reviewed-By: Ruben Bridgewater <ruben@bridgewater.de>
Reviewed-By: Colin Ihrig <cjihrig@gmail.com>
MylesBorins added a commit that referenced this pull request Mar 21, 2018
s/9\.7\.1/9\.8\.0

PR-URL: #19515
Reviewed-By: Ruben Bridgewater <ruben@bridgewater.de>
Reviewed-By: Colin Ihrig <cjihrig@gmail.com>
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

fast-track PRs that do not need to wait for 72 hours to land. meta Issues and PRs related to the general management of the project.

Projects

None yet

Development

Successfully merging this pull request may close these issues.

5 participants