chore(e2e): select the last matched droute pod - #3075
Merged
openshift-merge-bot[bot] merged 3 commits intoJul 4, 2025
Conversation
Signed-off-by: Patrick <pknight@redhat.com>
Contributor
|
The image is available at: |
Signed-off-by: Patrick <pknight@redhat.com>
Signed-off-by: Patrick <pknight@redhat.com>
dzemanov
approved these changes
Jul 4, 2025
Member
|
/lgtm |
|
[APPROVALNOTIFIER] This PR is APPROVED This pull-request has been approved by: albarbaro, dzemanov The full list of commands accepted by this bot can be found here. The pull request process is described here DetailsNeeds approval from an approver in each of these files:
Approvers can indicate their approval by writing |
openshift-merge-bot
Bot
merged commit Jul 4, 2025
0453215
into
redhat-developer:main
14 checks passed
chadcrum
pushed a commit
to chadcrum/rhdh
that referenced
this pull request
Aug 3, 2025
* chore(e2e): select the first matched droute pod Signed-off-by: Patrick <pknight@redhat.com> * chore(e2e): check to see if the last pod works Signed-off-by: Patrick <pknight@redhat.com> * chore(e2e): reenable skipped tekton pipelines test Signed-off-by: Patrick <pknight@redhat.com> --------- Signed-off-by: Patrick <pknight@redhat.com>
guyoron1
pushed a commit
to guyoron1/rhdh
that referenced
this pull request
Sep 29, 2025
* chore(e2e): select the first matched droute pod Signed-off-by: Patrick <pknight@redhat.com> * chore(e2e): check to see if the last pod works Signed-off-by: Patrick <pknight@redhat.com> * chore(e2e): reenable skipped tekton pipelines test Signed-off-by: Patrick <pknight@redhat.com> --------- Signed-off-by: Patrick <pknight@redhat.com>
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
Description
We are starting to see a wave of failing PR tests where the rbac showcase tests are not starting up. Looking at the logs, it seems like there are now two droute pods that are showing up where originally we only had one.
This is PR mainly aims to confirm my suspensions by selecting the first matched droute pod and checking if that fixes the problem.
Which issue(s) does this PR fix
PR acceptance criteria
Please make sure that the following steps are complete:
How to test changes / Special notes to the reviewer