Skip to content

Conversation

@github-actions
Copy link
Contributor

Bot-based backport to staging-22.11, triggered by a label in #210072.

  • Before merging, ensure that this backport complies with the Criteria for Backporting.
    • Even as a non-commiter, if you find that it does not comply, leave a comment.

@ofborg ofborg bot added the 8.has: clean-up This PR removes packages or removes other cruft label Jan 19, 2023
@ofborg ofborg bot requested a review from prikhi January 19, 2023 04:58
@ofborg ofborg bot added 10.rebuild-darwin: 501+ This PR causes many rebuilds on Darwin and should normally target the staging branches. 10.rebuild-darwin: 1001-2500 This PR causes many rebuilds on Darwin and should most likely target the staging branches. 10.rebuild-linux: 501+ This PR causes many rebuilds on Linux and should normally target the staging branches. 10.rebuild-linux: 1001-2500 This PR causes many rebuilds on Linux and should target the staging branches. labels Jan 19, 2023
@dotlambda dotlambda merged commit b1d3e05 into staging-22.11 Jan 19, 2023
@dotlambda dotlambda deleted the backport-210072-to-staging-22.11 branch January 19, 2023 19:00
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

8.has: clean-up This PR removes packages or removes other cruft 10.rebuild-darwin: 501+ This PR causes many rebuilds on Darwin and should normally target the staging branches. 10.rebuild-darwin: 1001-2500 This PR causes many rebuilds on Darwin and should most likely target the staging branches. 10.rebuild-linux: 501+ This PR causes many rebuilds on Linux and should normally target the staging branches. 10.rebuild-linux: 1001-2500 This PR causes many rebuilds on Linux and should target the staging branches.

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant