You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Status: 🔴 NOT STARTED (0/18 Complete) Created: Jan 26, 2026 Target: Complete before upstream PR to camptocamp/ogc-client
Overview
This master issue coordinates the comprehensive audit of the Connected Systems API implementation across 18 detailed verification plans before upstream submission. Each item below links to a dedicated child issue containing detailed checklists and verification methodology.
Audit Progress Dashboard
Tier 1: OGC Official Specifications (NORMATIVE COMPLIANCE) ⚖️
Phase 6: Pre-Submission Audit - Master Plan
Status: 🔴 NOT STARTED (0/18 Complete)
Created: Jan 26, 2026
Target: Complete before upstream PR to camptocamp/ogc-client
Overview
This master issue coordinates the comprehensive audit of the Connected Systems API implementation across 18 detailed verification plans before upstream submission. Each item below links to a dedicated child issue containing detailed checklists and verification methodology.
Audit Progress Dashboard
Tier 1: OGC Official Specifications (NORMATIVE COMPLIANCE) ⚖️
Status: 0/8 Complete
Tier 2: Maintainer Requirements (CRITICAL INTEGRATION) 🎯
Status: 0/2 Complete
Tier 3: Reference Implementations (VALIDATION) ✓
Status: 0/3 Complete
Tier 4: Upstream Patterns (CONSISTENCY) 🔄
Status: 0/2 Complete
Tier 5: Exploratory Work Baseline (IMPROVEMENT DOCUMENTATION) 📊
Status: 0/3 Complete
Implementation Context
Audit Approach
Evidence Requirements
Each audit must provide:
Pass Criteria
Execution Flow
Timeline
Related Issues
Notes