Skip to content

Bug coordinator#80

Merged
evan-palmer merged 9 commits into
mainfrom
bug-coordinator
Apr 14, 2026
Merged

Bug coordinator#80
evan-palmer merged 9 commits into
mainfrom
bug-coordinator

Conversation

@evan-palmer
Copy link
Copy Markdown
Member

Changes Made

This PR addresses a bug caused by the controller coordinator not waiting for hardware interfaces to finish activating before activating controllers. The controller state message used by the impedance controller was also replaced with a custom message.

Testing

Testing was done in simulation.

@evan-palmer evan-palmer self-assigned this Apr 1, 2026
@evan-palmer evan-palmer merged commit 9ac9eba into main Apr 14, 2026
3 of 4 checks passed
@evan-palmer evan-palmer deleted the bug-coordinator branch April 14, 2026 19:08
mergify Bot pushed a commit that referenced this pull request Apr 14, 2026
)

* fix coordinator

* Fixed impedance controller export

* debugging impedance controller

* debugging impedance controller

* fix more bugs - need to change impedance status message

* Replace impedance state message with custom message

* prepare for pr

* test different pose error

* geodesic distance is fine, im just dumb

(cherry picked from commit 9ac9eba)
@mergify mergify Bot mentioned this pull request Apr 14, 2026
evan-palmer added a commit that referenced this pull request Apr 25, 2026
) (#83)

* fix coordinator

* Fixed impedance controller export

* debugging impedance controller

* debugging impedance controller

* fix more bugs - need to change impedance status message

* Replace impedance state message with custom message

* prepare for pr

* test different pose error

* geodesic distance is fine, im just dumb

(cherry picked from commit 9ac9eba)

Co-authored-by: Evan Palmer <evanp922@gmail.com>
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant