Skip to content

Bug coordinator (backport #80)#83

Merged
evan-palmer merged 1 commit into
jazzyfrom
mergify/bp/jazzy/pr-80
Apr 25, 2026
Merged

Bug coordinator (backport #80)#83
evan-palmer merged 1 commit into
jazzyfrom
mergify/bp/jazzy/pr-80

Conversation

@mergify
Copy link
Copy Markdown

@mergify mergify Bot commented Apr 14, 2026

Changes Made

This PR addresses a bug caused by the controller coordinator not waiting for hardware interfaces to finish activating before activating controllers. The controller state message used by the impedance controller was also replaced with a custom message.

Testing

Testing was done in simulation.


This is an automatic backport of pull request #80 done by [Mergify](https://mergify.com).

)

* fix coordinator

* Fixed impedance controller export

* debugging impedance controller

* debugging impedance controller

* fix more bugs - need to change impedance status message

* Replace impedance state message with custom message

* prepare for pr

* test different pose error

* geodesic distance is fine, im just dumb

(cherry picked from commit 9ac9eba)
@evan-palmer evan-palmer merged commit 3b58ca9 into jazzy Apr 25, 2026
3 of 4 checks passed
@evan-palmer evan-palmer deleted the mergify/bp/jazzy/pr-80 branch April 25, 2026 22:07
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant